Metered Electric, Gas and Water Support |
Top Previous Next |
There are 4 things that need to be done for properly supporting metered electric, gas or water. Here's a brief checklist -- there is a more detailed walk-through section in the Maintenance chapter.
1. | Enable the appropriate fields in the Data Field Definitions for Sites (or disable them if no metered support is needed). |
2. | Set the meter wrap-around numbers, depending on the number of digits each type of meter has, in Park Setup / Parks. |
3. | Enter the current (or last) meter reading for each site that has a meter, through Park Setup / Sites. |
4. | Define one or more Electric/Gas/Water Meter Rates for the meter charges (Park Setup / Rates). |
Once the setup is done, you can simply enter the new readings (either one at a time or as a batch), and it will calculate the charges and update the reading for next time. See the Maintenance chapter for full details.